Skip to content
BaşûrSociety

Sêmêl-Sêcî dual carriageway 42% complete, bringing Dihok closer to Zaxo

2 min read
Sêmêl-Sêcî dual carriageway 42% complete, bringing Dihok closer to Zaxo

What happened?

Work on the strategic dual carriageway between Sêmêl and Sêcî in province is reported to be 42 percent complete. The road is scheduled to open in less than a year. The project aims to strengthen traffic links between Dihok, Sêmêl and and to reduce accidents.

The project is 9 kilometres long in total. Of this, 6 kilometres are being built as a new main road, while the old road is being renovated along the remaining 3 kilometres.

Muhammad Salih, the project's supervising engineer, said the 6-kilometre main road will connect the Tenahî road to the international road in the Sêmêl district. According to Salih, the road is being built to the highest technical and engineering standards. For durability, two layers of sub-base material, two layers of crushed stone and three layers of asphalt have been laid, Salih said.

The project is being carried out by North Light. The work goes beyond turning the road into a dual carriageway: 4 bridges, underpasses and a parallel service road are also being built as part of the project. Lighting and water networks, rainwater channels and other service facilities are included as well.

Shaban Selim, a representative of North Light, said work continues every day from 8 a.m. to 6 p.m.. According to Selim, between 300 and 400 workers are on site. Selim said the narrow single-lane road will become a 60-metre-wide, 4-lane avenue, adding that this will ease vehicle traffic and improve drivers' safety.

The Sêmêl-Sêcî road is one of 212 strategic road and bridge projects that the Kurdistan Regional Government (KRG) is carrying out within the boundaries of Dihok province. The project is part of the government's plan to develop infrastructure and make travel easier for citizens. The plan aims to shorten journey times between Dihok, Sêmêl and Zaxo and to reduce accidents on intercity roads.